Design, then compete the construction.
The owner contracts separately for design and building work, typically seeking construction bids from completed design documents.
Commercial general contractors in the Texas Triangle
A guide to comparing scope, experience and project coordination—before choosing a general contractor for a commercial building in the Texas Triangle.
Start with the essentials ↓
Start with the approach
The AIA and AGC distinguish the way a project is organized from the way its team is selected. Price, qualifications or a combination can inform selection; no delivery method is best for every owner. Read the joint AIA/AGC primer ↗
The owner contracts separately for design and building work, typically seeking construction bids from completed design documents.
One entity contracts with the owner for both. The project still needs clearly documented roles, scope and decisions.
A construction manager provides preconstruction services and takes on construction responsibility; the architect has a separate owner contract.
These are brief descriptions, not contract recommendations. Discuss the appropriate structure and risk allocation with the project’s advisers.
Questions worth asking
Ask for completed projects with comparable uses, size and complexity. Speak with references about communication, changes and follow-through.
Who will manage the job? Who will supervise work on site? Ask about current workload and the availability of the trades the project needs.
Compare proposals against the same information. Identify allowances, exclusions, owner-supplied items and any design work still needed before pricing is dependable.
Ask which dates depend on owner decisions, reviews, utility work and material delivery. Clarify the difference between a target and a confirmed milestone.
In AGC/NCCER’s September 2026 national survey release, 42% of respondents reported project delays linked to shortages of their own or subcontractors’ workers. This is a reason to ask about actual team availability—not a measured shortage in every Texas Triangle market. Read the survey release ↗
From planning to handover
Our planning checklist: identify the owner’s decision-maker, agree on regular project updates and keep a shared record of decisions. Before work changes, clarify the scope, cost and schedule effect through the project’s agreed process.
Ask how the team will coordinate design questions, equipment information, inspections and the documents needed at turnover. A clear handoff matters as much as a strong start.
A property address or target area, the intended use, approximate size, any available plans, a budget range and the desired opening date. Identify the questions that are still open.
No. Confirm the adopted code edition, amendments and approval process with the authority for the specific site. A model-code publication is not local permit approval. ICC’s Texas adoption resources ↗
Discuss the services available and how they will be contracted. Identify the architect, engineers and construction responsibilities rather than assuming that a single proposal includes everything.
Read further · sources checked September 28, 2026
Original summaries and general planning guidance. Not a market study, legal advice, engineering design or guarantee of project cost, timing or returns. Source organizations do not sponsor or endorse this site.